Chen and Associates is currently working on the Stormwater Master Plan update for the Fort Lauderdale-Hollywood International Airport. This project includes gathering all existing information available from previous permits, reports and studies and confirming their accuracy for use in the existing conditions model; and preparing the existing conditions model with Interconnected Pond Routing Software and working with Broward County Environmental Protection Division and the South Florida Water Management District to confirm that the modeled flood stages and peak discharges match the levels in previously issued permits. In addition, Chen and Associates will prepare the “future conditions” model based on the airport master plan and submitting for a conceptual stormwater management permit from Broward County EPD and SFWMD as well as work with the consulting engineers for the new south runway to submit for a construction permit.